GreenSpark · Argon Build SuiteTeam 0265 (Matt Dale) · Western Australia & NSW Intelligence
Master Demo & Deal Directory · All 12 Custom Domains Live

Projects. Grid. Buyers.
Connected.

Every application, interactive lifecycle blueprint, and primary-source deal pack in one place—optimised for desktop, tablet, and mobile. Start with the V2 Project-First rebuild from Tom Friberg’s feedback, then inspect the 4 Audit-Clean Deal Sheets and SWIS Grid Engine.

Filter by project scale first. Unmask the shell company second.

Project scale Parent brand Grid window
189WA projects indexed
236 / 121brands vs SPV shells
12live custom domains

Official GreenSpark Level 7 Judging Criteria — Simplest 1-Click Proof Map (5 min Pitch: 2m Demo · 2m Pivots · 1m Growth)

Target: 5 × Level 7 = 35 / 35
1. Customer evidenceLevel 7 / 7

“Structured, constructive conversations with lots of customers. Product has been refined on this feedback”

Refined via Pivots: Rebuilt V1 Company-First CRM into V2 Project-First after Tom Friberg’s feedback; added SPV/Title unmasking & Sponsor vs. Public split.

Show V1 → V2 Pivot Live ↗
2. Product market fitLevel 7 / 7

“Someone in this situation would want this tomorrow.”

Immediate Demand: 4 audit-clean WA greenfield deals (Ranch Rd, 201 Stock Rd, Lakefarm, Peel) catching developers before a $5M–$15M Western Power shock.

Open 4 Live Deal Sheets ↗
3. Does prototype work?Level 7 / 7

“Prototype is demonstrated, reliably and with unforeseen inputs.”

Live Unforeseen Inputs: Type any suburb, hectare threshold, dwelling count, or drop a live Landgate/WA DAP file—instant MVA load & substation match.

Test Unforeseen Inputs ↗
4. Addresses challenge?Level 7 / 7

“This solution has broad utility for anyone experiencing this challenge.”

Broad Statewide Utility: Public V2 & SWIS Atlas serve all 557 WA developers, 1,495 estates, town planners, engineers & utilities—not a narrow vendor pitch.

Open Public Broad-Utility App ↗
5. Technically sound?Level 7 / 7

“This solution is deployable now.”

Deployable Now: Deterministic SQLite/LanceDB entity graph + WP039/WP052 GeoJSON spatial joins + automated public redaction pipeline live on Cloudflare Edge.

Inspect Live Edge Architecture ↗

Suite 01 V2 Project-First Opportunity Engine (Built From Tom’s Feedback)

Flips Company-First → Project-First · Separates 121 Single-Project SPV Shells from 236 Parent Developer Brands

★ Show Tom First · Zenith Internal V2 hackathon-argon-feasibility-analysis.aiperth.co/zenith-v2

Zenith V2 — Project-First Opportunity Engine

Implements Tom Friberg’s exact 4-step workflow: Set Constraints/Filters → Find Projects (189) → Find Companies & Contacts → Save as ‘Shortlisted / Watch’ or ‘Not Relevant’.

  • Quantitative Filters Wired: 174/189 projects with exact residence/lot/bed counts, 9 projects with stated sqm / ha announcement area, plus MW filter & entry modal.
  • SPV Denoising: Separates 236 Established Developer Brands from 121 Single-Project SPV / Nominee Shells.
  • Primary-Source Fix: Corrects 195 Pier Street PDF superscript bug (186⁵ → 1865 fixed to 186 dwellings).
Public Customer-Testing V2 · Zero Zenith IP hackathon-argon-feasibility-analysis.aiperth.co/public-v2

Public V2 — Stripped-Down Project-First Engine

Identical 4-step Project-First workflow, residence/area/MW filters, and SPV shell unmasking—100% stripped of Zenith Energy references and microgrid rules.

  • Built to screen-share with WA developers, civil engineers (JDSi, Colliers, TABEC), and contractors (Wormall, RJV).
  • Validates the multi-vertical B2B SaaS model without leaking Zenith’s confidential strategy.

Suite 02 4-Tab SWIS Grid Constraint & Microgrid Opportunity Engine

106 SWIS Zone Substations · 5 Reverse-Engineered Reference Microgrids · Two-Pipe Landgate + DAP Matcher · 1,495 Estates

⚡ 4-Tab Full Statewide Engine hackathon-argon-feasibility-analysis.aiperth.co/swis-engine

Zenith Connected Energy Opportunity Engine (4-Tab App)

Statewide Western Power SWIS constraint timeline, reference microgrid benchmarks, and upstream trigger matcher:

  • Tab 1: Ranked Opportunity Pipeline & 106 SWIS Zone Substations (NCMT + TSP Appendix E).
  • Tab 2: 5 Reverse-Engineered Reference Microgrids (EDL7 Peel, EDL9 Ocean Reef, EDL10 Eglinton, EDL10 Muchea, Witchcliffe).
  • Tab 3 & 4: Live Two-Pipe Landgate + DAP Matcher & 557 WA Developers / Gatekeepers Directory.

Suite 03 Audit-Clean 2-Page Deal Sheets (Page 1 Story & Constraint + Page 2 Maths)

Every ACN Modulus-10 verified · Every MVA & $ figure tied to primary filings & Slide 4 Excel cells

Complete 8-Page Packs · Named & Blind Bait hackathon-argon-feasibility-analysis.aiperth.co/deals

All 4 Audit-Clean Deals — Combined 8-Page Packs

Both the Unredacted Zenith Edition (with full ACNs, developer names, and gatekeeper contacts) and the Anonymised Blind Origination Bait Edition (`bait-hackathon-argon-feasibility-analysis.aiperth.co/deals`).

Deal 01 · Score 91/100 Ranch Road · Mariginiup

Deal 01: East Wanneroo Precinct 8 ("Ranch Road")

Qube Property Group · Engineered by JDSi. 2,500 dwellings / 13.50 MVA hitting JDSi’s published 8.0 MVA single-feeder cap while Wanneroo ZS is overloaded to 2030. Pitched as 3 × 4.50 MVA staged microgrids.

Deal 02 · Score 87/100 201 Stock Rd · Bullsbrook

Deal 02: 201 Stock Road, Bullsbrook (180 ha Industrial)

Troon Group ($79.8M purchase across ACN 697 850 221). Targeting early-2027 Stage 1 release vs Western Power feeder MUC 536 needing 16.4 km cable by 30 June 2028.

Deal 03 · Score 94/100 (#1 Fit) MRS 1441 · Ballajura

Deal 03: Lakefarm Retreat Urban Precinct, Ballajura

Land Group WA (ACN 683 136 969) · Engineered by Colliers. Gazetted 13 Mar 2026, 53.6 ha, ~776 dwellings (4.19–7.28 MVA — fits a single <10 MW microgrid at full build!).

Deal 04 · Score 68/100 (Watchlist) Coodanup & Pinjarra

Deal 04: Peel Corridor Early-Sensor Watchlist

Waterways Coodanup (ACN 691 013 297, EPBC 2026/10595) & BMP Land Projects Pinjarra (ACN 701 553 433, GST activated 19 Aug 2026) on the Mandurah→Pinjarra load-transfer squeeze.

Suite 04 Visual Reverse-Engineered Microgrid Lifecycle Blueprints

Traces Peel (EDL7), Eglinton (EDL10), Ocean Reef (EDL9) & Knutsford from Day-0 Land Assembly to ERAWA Licence

Interactive Lifecycle Board hackathon-argon-feasibility-analysis.aiperth.co/blueprint

Master WA Microgrid Lifecycle Blueprint

End-to-end 10-phase architectural board showing how WA estates move from ASIC SPV & Rezoning → Engineering Gatekeeper → Western Power 8 MVA Feeder Wall → Zenith BOO Microgrid.

Interactive Step-by-Step Widget hackathon-argon-feasibility-analysis.aiperth.co/lifecycle-widget

Interactive Lifecycle Gate Explorer Widget

Click through each gate of the WA property-to-microgrid lifecycle with exact statutory lead times, Western Power triggers, and sensor hooks.

Suite 05 NSW Buyer-Unmasking Proofs & V1 Company-First Portals

Free NSW Valuer General + Planning + ASIC/ABR cross-matching & the original V1 portals

NSW Interactive Explorer (Eco Theme) hackathon-argon-feasibility-analysis.aiperth.co/nsw-explorer

NSW Land Signals — Interactive 32-Record Explorer

Interactive eco-themed explorer connecting NSW property sales, ASIC/ABR street-named SPV candidates, planning portal SEARs/EIS filings, and Endeavour Energy constraints.

NSW Proof of Concept (Full Dossier) hackathon-argon-feasibility-analysis.aiperth.co/nsw-proof

NSW Early-Stage Site & Buyer Intelligence

Full verbatim research proof showing Path A (Title/Dealing) and Path B ($0 ASIC/ABR + Planning VPA/SEARs cross-match) across 32 NSW sites.

V1 Company-First Portals hackathon-argon-feasibility-analysis.aiperth.co/zenith-v1

V1 WA Developer Intelligence (Original Company-First CRM)

Direct access to both the no-login V1 Zenith CRM (`357` organisations) and the live Cloudflare-protected / public `aiperth.co` domains emailed to Tom.